Projects

At Eiffage Metal España, as a leading renewable energy sector company and specialists in the manufacture of wind towers for wind turbines, the major national and international companies place their trust in us, for the undertaking of their various wind farm projects.

From among our major clients, the following projects are highlighted:

Vestas:

    • Manufacture of 23 towers with 4 sections each, with a length per tower of 102 metres, in several Wind Farms: Mikronoros (Greece), and Picardor and Azubías (Zaragoza).
    • Manufacture of 21 towers with 3 sections each, with a length per tower of 79 metres, in several Wind Farms: Grammeni and Voidolivado (Greece).
    • Manufacture of 36 towers with 3 sections each, with a length per tower of 78 metres, in several Wind Farms: Maverick (Texas, USA), Cimarron Bend III (Kansas, USA), and Merricourt (Dakota, USA).

Acciona Windpower:

    • Manufacture of 17 towers with 5 sections each, with a length per tower of 112 metres, installed in the Motilla Wind Farm (Cuenca, Castile-La Mancha).
    • Manufacture of 7 towersfor the Serra de Oribio Wind Farm (Lugo, Galicia).
    • Manufacture of 8 towers, for the San Francisco de Borja Wind Farm (Borja and Fréscano, Zaragoza).
    • Manufacture of 4 towers, installed in the El Campo y La Estanca Wind Farms (Mallén and Fréscano, Zaragoza).

General Electric:

    • Manufacture of 6 towers with 5 sections each, with a length per tower of 109 metres, installed in the Soliedra Wind Farm (Soria, Castile and León).
    • Manufacture of 5 towers with 3 sections each, with a length per tower of 72 metres, installed in the Zarakes Wind Farm (Greece).